Abstract
Minimizing costs when organizing the supply of drilling rigs with spare parts is an important task. To do this, it is necessary to develop evaluation criteria or rely on information obtained from the monitoring system in real time. The paper proposes a model for processing the output of a drilling rig, depending on the possible strategy for operating the equipment. The work is an integral part of previously published developments presented in the materials of articles in 2-nd and 3-rd International innovative mining symposiums (2017-2018).
Reference12 articles.
1. Predictive Asset Analytics to Improve Mining Operations (Schneider Electric Software, Berlin, 2015)
2. Priority queueing systems: from probability generating functions to tail probabilities
3. Gallant S.I., Neural Network Learning and Expert Systems (MIT Press, Boston, 1993)
4. Gel’man V., Marganiya O., Resource Curse and Post-Soviet Eurasia: Oil, Gas, and Modernization (Logano Pub., Chicago, 2010)
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献