Abstract
Jinzhou New District Medical Center of the first Affiliated Hospital of Dalian Medical University is the largest medical construction project, which has a large volume, complex functions, and involves many construction majors. It also has many difficulties during construction processes and need to meet high quality requirements. Therefore, traditional construction methods are difficult to meet its design requirements. BIM technology is used in the project, to perform construction process simulation, to optimize construction organization and to control cost and quality. In fact, it is applied in the whole construction management, quality management, cost management and safety management, which leads to the great success in avoiding the problems of design defects, quality hazards and economic losses caused by the complicated process requirements of medical construction projects. The result shows that BIM technology has brought many benefits, such as some economic effect, the shortened construction period and the expected quality and safety objectives. That is to say, the application effect of BIM technology is remarkable.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献