Udintsev V.S.,Danani S.,Taylor G.,Giacomin T.,Guirao J.,Pak S.,Hughes S.,Worth L.,Vayakis G.,Walsh M.J.,Schneider M.,Pandya H.K.B.,Kumar R.,Kumar V.,Jha S.,Thomas S.,Padasalagi S. B.,Kumar S.,Phillips P. E.,Rowan W. L.,Austin M.E.,Khodak A.,Feder R.,Neilson H.,Basile A.,Hubbard A. E.,Saxena A.,Nazare C.,Maquet P.,Gimbert N.
Abstract
The ITER Electron Cyclotron Emission (ECE) diagnostic is progressing towards its Preliminary Design Review (PDR). In parallel, the diagnostic integration in the Equatorial Port is ongoing. Port Integration has to address the structural integrity to withstand various loads, maintenance and the safety aspects of ECE diagnostic. The ITER ECE system includes radial and oblique lines-of-sight. Recently, a successful peer-review of the in-port plug Hot Calibration Source has taken place and its performance and integration feasibility has been demonstrated. Four 45-meter long low-loss transmission lines are designed to transmit mm-wave power in the frequency range of 70- 1000 GHz in both X- and O-mode polarization from the port plug to the ECE instrumentation room in the diagnostic building. Prototype transmission lines are being tested [1]. A prototype polarizing Martin-Puplett type Fourier Transform Spectrometer (FTS) operating in the frequency range 70-1000 GHz, has a fast scanning mechanism and a cryo-cooled dual-channel THz detector system. Its performance has been tested as per ITER requirements. Assessment of the instrumentation and control requirements, functional and non-functional requirements, operation procedures, plant automation are ongoing for the PDR. The current status of the diagnostic, together with integration activities, is presented.
Reference8 articles.
1. Kumar R.et al.,“Comparative studies of various types of transmission lines in the frequency range 70 GHz -1 THz for ITER ECE diagnostic” this Workshop.
2. Udintsev V.S.et al.,Fusion Engineering and Design,88(6), (2013).
3. Udintsev V.S.,“Exploring measurement capabilities of ITER ECE system” Proc. FEC (San Diego) IAEA-CN-197/ITR/P5-41. (2012).
4. Taylor G.et al.,Proc. of EC-19 Workshop.,Ahmedabad, India(2016).
5. Integrated real-time control of MHD instabilities using multi-beam ECRH/ECCD systems on TCV