Strategic Level Implementation: Development Criteria for IBS Formwork System Readiness Framework (IBS FOSREF) for Malaysian Construction Industry

Author:

Baharuddin Mohd Nurfaisal,Bahardin Nur Fadhilah,Zaidi Mohd Azian,Yusof Mohd Reeza

Abstract

The Industrialized Building System (IBS) was introduced by the Construction Industry Development Board (CIDB) are classified to precast concrete framing, panel and box systems, steel formwork systems, steel framing systems, prefabricated systems and block work system which is mainly components based systems and products (CIDB, 2007). According to Nawi (2011), the benefit of IBS formwork system implementation will lead to environmental friendly which reduce the harmful impact on the environment by better use of available resources and reuse of molds will affect less of waste materials. Since there is no theory about readiness factors of IBS formwork system in Malaysia, the stakeholders will not realize the significance of IBS formwork system. Most of the challenges factor in implementation of IBS formwork system is the attitude of Malaysian construction stakeholders which are un-readiness in facing of globalization era since it was already stated by IBS Roadmap (2003-2010). Hence, the goals of this research are to analyses the critical factors of driving or hindering the used of IBS formwork system in the Malaysian construction industry. A survey among 157 respondents which are construction personnel was employed for the study. The survey result shows that fifteen (15) identified factors for IBS formwork implementation are further ranked according to the average mean score perceived by construction personnel as follow: (F6: Government Initiative), (F12: Roles of Agencies), (F13: Procurement), (F7: Training), (F14: Incentives), (F15: Manufacturer Availability), (F11: Familiarity of IBS System), (F4: Qualified Technical Team), (F8: Cost … Financial), (F3: IBS Score Index), (F1: Project Trend), (F10: Compliance of Policy), (F5: IBS Scoring Manual), (F9: Promotion) and (F2: Contractor Involvement). Other than that, the development of IBS Formwork System Readiness Framework (IBS FOSREF) incorporated with Strategic Level Implementation Mc Kinsey 7s for Malaysian Construction Industry which are the main outcome for this research could facilitate the Malaysian construction stakeholders to ensure IBS formwork system implementation will be success.

Publisher

EDP Sciences

Subject

General Medicine

Reference19 articles.

1. Baharuddin M. N., Bahardin N. F., Zaidi M. A., Lokman I., Nawi. M. N. M (2016), “An Exploratory Review on Critical Factors of IBS Formwork implementation for Malaysian Construction Stakeholders”, in International Soft Science Conference (ISSC 2016), Langkawi, 2016, AIP Conference Proceedings 020023 (2016).

2. Baharuddin M. N., Bahardin N. F., Zaidi M. A., Yusof M. R., Lokman I. (2015), Identification of Critical Factors and Difficulties for Industrialised Building System (IBS) Formwork in Malaysian Construction Industry - A Literature Review, 2nd International Conference on Science and Social Research (CSSR 2015).

3. Chung L.P. & Kadir A.M, Implementation Strategy for Industrialized Building System. Master Thesis, Universiti Teknologi Malaysia (UTM), Johor Bahru (2007).

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3