1. M. Nawi, M. Mydin, A. Kamaruddeen, A. Lee, and S. Ibrahim, “Technology Acceptance: Malaysian Industrialised Building System (IBS) Case,” Aust J Basic Appl Sci, vol. 9, no. April, pp. 110–112, 2015.
2. CIDB, “Construction 4.0 Strategic Plan (2021-2025),” 2020.
3. M. A. Mohd Fateh and M. F. Mohammad, “The framework of factors for the improvement of the significant clauses in the standard form of contract for the ibs construction approach in Malaysia,” International Journal of Sustainable Construction Engineering and Technology, vol. 12, no. 1, pp. 164–169, 2021.
4. M. R. Yusof, M. F. Musa, and N. S. Samsudin, “Industrialized Building System Plan of Work,” International Review of Management and Marketing, vol. 6, pp. 299–305, 2016.
5. M. Nurfaisal Baharuddin et al., “Strategic Level Implementation: Development Criteria for IBS Formwork System Readiness Framework (IBS FOSREF) for Malaysian Construction Industry”, 2019.