Abstract
The topic of the paper is referred to optimization model for multiobjective solutions for construction management. It is known in literature as Time Coupling Methods (TCM). It presents another approach to scheduling methods from known methods like LSM, CPM/PERT, LOC, RSM. TCM is based on couplings that bounds activities in technology and management. The new modifications to TCM will be presented that add flexibility when dealing with complex civil engineering problems.
Reference20 articles.
1. Afanasev V.A., Afanasev A.V. Stream scheduling of works in civil engineering. St. Petersburg (in Russian). 2000.
2. Arditi D., Tokdemir O.B. & Suh K. Scheduling system for repetitive unit construction using line-of-balance technology. Scheduling system for repetitive unit construction using line-of-balance technology. Department of Civil and Architectural Engineering, Illinois Institute of Technology, Department of Civil Engineering, Honan University, Honam, South Korea. 433–446. 2001.
3. Faghihi S. V., Nejat A., Reinschmidt K., Kang J.H. Automation in construction scheduling: a review of the literature. International Journal of Advanced Manufacturing Technology 81(9), 2015.
4. Goldratt E.M. Critical Chain. Great Barrington, MA: The North River Press. 1997.