Author:
Faghihi Vahid,Nejat Ali,Reinschmidt Kenneth F.,Kang Julian H.
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference92 articles.
1. Aamodt A, Plaza E (1994) Case-based reasoning: foundational issues, methodological variations, and system approaches. AI communications, 7(1), 39–59. Retrieved from http://dl.acm.org/citation.cfm?id=196108.196115 Feb 2014
2. Abd El Razek RH, Diab AM, Hafez SM, Aziz RF (2010) Time–cost-quality trade-off software by using simplified genetic algorithm for typical-repetitive construction projects. World Acad Sci, Eng Technol 37:312–321
3. Adeli H, Karim A (1997) Scheduling/cost optimization and neural dynamics model for construction. J Constr Eng Manag 123(4):450–458. doi: 10.1061/(ASCE)0733-9364(1997)123:4(450)
4. Avila Rondon RL, Carvalho AS, Hernandez GI (2008) Neural network modelling and simulation of the scheduling. Eighth IFIP international conference on information technology for balanced automation systems, Porto, Portugal. Springer USA, pp. 231–238
5. Azaron A, Perkgoz C, Sakawa M (2005) A genetic algorithm approach for the time–cost trade-off in PERT networks. Appl Math Comput 168(2):1317–1339. doi: 10.1016/j.amc.2004.10.021
Cited by
67 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献