Author:
Lapidus Azary,Abramov Ivan
Abstract
To streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency and, sometimes, even the feasibility of a construction project as a whole. Therefore, the purpose of this paper’s research is to develop a method for determining optimum technical and economic parameters. A method should be considered legitimate which, given the labour intensity of the jobs assigned to a crew and the list of such jobs, makes it possible to determine the time said jobs will take to perform depending on the variation of the following factors: crew/unit numbers, job synchronization degree, job performance sequence, number of shifts and unit productivity. The authors have studied the algorithm and the method for the trial modeling of organizational and process-related factors when developing a calendar plan in order to identify qualitative time-specific and feasibility parameters. The paper reviews the example of how the optimum performance timelines for each crew can be determined.
Reference18 articles.
1. Lapidus A.A., Abramov I.L., Science Bulletin, 4 (2017)
2. The analysis of the functionality of modern systems, methods and scheduling tools
3. Lapidus A., Abramov I., Science and Business, 10 (2017)
4. Lapidus A.A.. Berezhny A.Yu., Building materials, equipment, technologies of the 21st century, 12 (2010)
Cited by
25 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献