Preventive Modelling in Risk Management on the Construction Project

Author:

Hayati Kemala1,Yulia 1,Agung Daffa1

Affiliation:

1. Universitas Muhammadiyah Aceh

Abstract

The construction industry is a service sector that is often faced uncertain circumstances with a high rate of changes in its project operations. These changes not only often occur in the implementation (build) phase of a construction project, but it also happens in the planning (design) phase. In general, dealing with such uncertain circumstances means to have the possibility for failure in achieving the goals of a project. Even though changes and adjustments are common in this sector, it nevertheless will bring risks to the construction works. For example, the time, costs, and quality. Hence, a preventive system is needed with which can minimise the risks that may arise during the project activities. The objective of this research is to identify the caused factors of the risks on the construction business, and that to further suggest the applicable model as the preventive action of the risks. This study began with a detail review to seven risk indicators; Labour Risk (X1), Contractual Risk (X2), Human Resources Risk (X3), Design and Technology Risk (X4), Material and Tool Risk (X5), Implementation Risk (X6), and Force Majeure Risk (X7). This research was developed further using questionnaires and expert validation as the primary data, which furthermore analysed using analysis factors, descriptive analysis, and probability impact matric in order to determine the level of the risks. The risk level analysis resulted three variables as the top event (dominant risk), which are X1, X3 and X4. These findings were then advanced following Bowtie diagram and scenario analysis, hence suggested a modelling that described possible preventive and corrective strategies. Both the Bowtie diagram and scenario analysis are not only helpful as the guidance and warning, but also practical for the construction practitioners in managing the risk management and decision making for the construction project.

Publisher

Trans Tech Publications Ltd

Reference16 articles.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3