Causes of Conflicts in a Construction Industry: A Communicational Approach
Author:
Publisher
Elsevier BV
Subject
General Medicine
Reference36 articles.
1. Acharya, N.K., & Lee, Y.D. (2006). Conflicting factors in construction projects: Korean perspective. Construction and Architectural Management, 13 (6), 543-566. http://dx.doi.org/10.1108/09699980610712364.
2. Acharya, N.K., Lee, Y.D., & Kim, J.K. (2006 A). Critical construction conflicting factors identification using analytical hierarchy process, KSCE Journal of Civil Engineering (Korean Society of Civil Engineers), 10 (3), 165-174. http://dx.doi.org/10.1007/BF02824057.
3. Awakul, P., & Ogunlana, S.O. (2002). The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study, Construction Management and Economics, 20 (4), 365-377. http://dx.doi.org/10.1080/01446190210133456.
4. Brauers, W.K. M., Zavadskas, E.K., Kildienė, S., Kaklauskas, A. (2012). Multiple criteria decision support system for assessment of projects managers in construction, International Journal of Information Technology & Decision Making, 11 (2), 246-258.
5. Bristow, D., & Vasilopoulos, R. (1995). The new CCDC 2: facilitating dispute resolution of construction projects, Construction Law Journal, 11 (2), 95-117.
Cited by 93 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Critical Evaluation of the Contract Selection Process Used in the Construction Industry of Kuwait;Buildings;2024-07-23
2. Development of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method;Journal of Construction Engineering and Management;2024-07
3. Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry;International Journal of Building Pathology and Adaptation;2024-06-17
4. Integrated project delivery (IPD) capabilities on reducing claims in urban underground projects: A hybrid FAHP-FTOPSIS approach;Sustainable Futures;2024-06
5. Digital Technologies for Preventing, Mitigating, and Resolving Contractual Disagreements in the AEC Industry: A Systematic Literature Review;Journal of Construction Engineering and Management;2024-06
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3