Affiliation:
1. CCCC Tianjian Port Engineering Institute Co. Ltd.
2. National Marine Data and Information Service
Abstract
The traditional method of the offshore caisson positioning and installing is using the barge or floating crane, but for the large caisson with 26,000 tons, the method is unable to achieve apparently. In this paper, the offshore location and installation of the large caisson with mooring line system and anchor cable system are studied. The research gets the wave and flow conditions results as well as the related and advertent items, which provide the reference for large caisson positioning and installation as well as the similar engineering construction technology.
Publisher
Trans Tech Publications, Ltd.
Reference3 articles.
1. Qian Wang, Yong Gang Tan: Advanced Materials Research Vol. 368-373, (2012), p.1491.
2. Wave Model Test Regulation(JTJ/T 234-2001)Ministry of Transport of the People's Republic of China.
3. Kang Song-tao, Hong Ling-yun: China Harbour Engineering No. 4 (2013), p.53.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献