Location Selection and Size Estimation of Resource Buffers in the Critical Chain Project Management Method

Author:

Paprocka Iwona1,Czuwaj Weronika1

Affiliation:

1. Silesian University of Technology

Abstract

Critical Chain Project Management (CCPM) is based on a network planning and the Theory of Constraints. The importance of management of uncertainty and deviations that occur during a project is emphasized. The probability of the project completion in a predefined time limit, or even before the time limit is increased. Literature analysis indicates that other types of buffers must be applied (buffer supporting a project, buffer reacting on a critical path, buffer reacting on a non-critical path) apart of feeding, resource and project buffers. Applying the additional buffers keeps the critical path in the same position and maintains the unchanging due date of the project. Methods estimating size of feeding and project buffers are identified: half of the chain method, square root of fault method, modified method of square root of fault, method taking into account due date of the project. In this paper, a new method estimating a size of resource buffer and selecting a location of resource buffer based on the theory of probability is presented. In this paper, the CCPM method is applied to estimate due date of the mining machine production project.

Publisher

Trans Tech Publications, Ltd.

Reference11 articles.

1. E. M. Goldratt, Critical Chain, Mintbooks, (2009).

2. M. Połoński, K. Pruszyński, Location of time-buffers in the critical chain method in construction work schedules (in Polish), Building Review. I, 2 (2008) 45-49.

3. Critical Chain Method and Free Inventory Management in Asta Powerproject (in polish), Project Management Institute, available at http: /www. 4pm. pl/artykuly/metoda-lancucha-krytycznego-i-zarzadzania-wolnymi-zapasami-w-asta-powerproject, accessed: 18. 02. (2015).

4. J. Liu, T. Whango, A study on the buffer sizing method of CCPM Technique using statistical analysis, Springer - Verlag Berlin (2012) 672-679.

5. JS Project, CCPM, 2009, available at http: /jsproject. pl/wiedza/441-bufory-w-projekcie, accessed: 18. 02. (2015).

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3