Abstract
In project network planning, the correlation complexity of the processes is not only related to the immediately preceding and following processes, but also closely related to indirect adjacent processes. In the existing relevant studies, many scholars have considered the influence of direct adjacent processes but ignored the influence of indirect adjacent processes. In addition, the three-point time estimation method and Monte Carlo simulation are mostly used in the current research for the estimation of process duration, while less research exists on the estimation of process optimal duration under multi-objective constraints. Therefore, this paper proposes a buffer calculation model of critical chain based on adjacency information entropy. This methodology provides comprehensive consideration of the relationship between cost, quality, safety, environment and process duration, the influence of process’s resource demand intensity, resource constraints and process duration on the buffer size, the influence of the relay potential of mutual cooperation and cross construction between processes, as well as the influence of adjacent complexity of processes on the project construction schedule. The calculation example analysis shows that this method can improve the accuracy of the calculation of process safety time, reduce the influence of the complexity of process adjacency correlation on the project construction schedule, reasonably control the buffer size, and effectively shorten the planned project duration.
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Reference41 articles.
1. Application of the Critical Chain Technique to the Project Scheduling Management;Bao;J. Lanzhou Jiaotong Univ.,2009
2. Project Cost, Progress and Quality Integrated Evaluation Based on Vector Angle Cosine;Chen;J. Civ. Eng. Manag.,2016
3. Goldratt, E.M. (1997). Critical Chain, The North River Press.
4. Review and Prospect of Buffer Sizing of a Critical Chain Project;Zhang;Manag. Rev.,2017
5. On the merits and pitfalls of critical chain scheduling;Herroelen;J. Oper. Manag.,2001