Affiliation:
1. Silesian University of Technology
Abstract
In the paper a production model with failures is presented where successive failure-free times are supposed to have normal distributions and are followed by normally distributed times of repairs. Unknown parameters of distributions are estimated using e.g. empirical moments approach. Predictions of unknown parameters are done using classical regression method. Having Mean Time To First Failure, and Mean Time of Repair a disturbance robust predictive schedule is generated using rule: Minimal Impact of Disturbed Operation on the Schedule. If a machine's failure-free time is not successfully predicted reactive schedule is generated using criterion: Minimal Impact of Rescheduled Operation on the Schedule.
Publisher
Trans Tech Publications, Ltd.
Reference8 articles.
1. N. Al-Hinai, T.Y. ElMekkawy: Robust and flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm, International Journal of Production Economics 132 (2011), pp.279-291.
2. A. Duenas, D. Petrovic: An approach to predictive-reactive scheduling of parallel machines subject to disruptions. Ann Oper Res., Vol. 159 (2008), p.65.
3. C. Grabowik, D. Krenczyk, K. Kalinowski, The hybrid method of knowledge representation in a CAPP knowledge based system. Lecture Notes in Computer Science, 7209 LNAI (PART 2) (2012), pp.284-295.
4. S. Gurel, E. Korpeglu, M.S. Akturk: An anticipative scheduling approach with controllable processing times, Computers & Operations Research, Vol. 37, Issue 6 (2010), p.1002.
5. I Paprocka, W. Kempa: Modeling and simulation of a production system in order to reach a robust schedule – numerical example. Part II (in Polish), Przegląd Mechaniczny Vol. 2 (2013), pp.28-31.
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献