1. Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: Estimation of overall equipment effectiveness using simulation programme. Mater. Sci. Eng. 95, Article Number: 012155, 1–6 (2015)
2. Guilherme, E.V., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6(1), 35–58 (2003)
3. Fahmy, S.A., Balakrishnan, S., ElMekkawy, T.Y.: A generic deadlock-free reactive scheduling approach. Int. J. Prod. Res. 47(20), 5657–5676 (2009)
4. Hamzadayi, A., Yildiz, G.: Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server. Comput. Ind. Eng. 91, 66–84 (2016)
5. Liu, L., Han-yu, G., Yu-geng, X.: Robust and stable scheduling of a single machine with random machine breakdowns. Int. J. Adv. Manuf. Technol. 31, 645–656 (2007)