1. Aalami, F.B. 1998. Using construction method models to generate four-dimensional production models. Ph.D. Dissertation,Department of Civil and Environmental Engineering, Stanford University, CA.
2. Akinci, B., Fischer, M. & Zabelle, T. 1998. Proactive approach for reducing non-value adding activities due to time-space conflicts. Proceedings of the 6th annual conference of the International Group for Lean Construction (IGLC-6): Guaruja, Brazil, August:12 pp., available at http://www.ce.berkeley.edu/~tommelein/IGLC-6/
3. Towards a general theory of action and time
4. An analysis of several configuration design systems
5. Shielding Production: Essential Step in Production Control