1. Ballard G. and Howell G. (1997a). “Implementing lean construction: stabilizing work flow.” Lean Construction; Proc. 2nd Annu. Meeting of Int. Group for Lean Constr. A. A. Balkema Publishers Rotterdam The Netherlands.
2. Ballard G. and Howell G. (1997b). “Implementing lean construction: improving performance behind the shield.” Lean Construction; Proc. 2nd Annu. Meeting of Int. Group for Lean Constr. A. A. Balkema Rotterdam The Netherlands.
3. Ballard G. and Howell G. (1997c). “Toward construction JIT.” Lean Construction; Proc. 1995 ARCOM Conf. A. A. Balkema Rotterdam The Netherlands.
4. Ballard G. Howell G. and Casten M. (1996). “PARC: a case study.” Proc. 4th Annu. Conf. on Lean Constr. http://www.vtt.fi/rte/lean/.
5. Ballard G. Howell G. and Kartam S. (1994). “Redesigning job site planning systems.” Proc. Conf. on Comp. in Civ. Engrg. ASCE New York N.Y.