Sanni-Anibire Muizz O.,Zin Rosli M.,Olatunji Sunday O.
Abstract
The construction industry, for many decades, has been underperforming in terms of the success of project delivery. Construction delays have become typical of many construction projects leading to lawsuits, project termination, and ultimately dissatisfied stakeholders. Experts have highlighted the lack of adoption of modern technologies as a cause of underproductivity. Nevertheless, the construction industry has an opportunity to tackle many of its woes through Construction 4.0, driven by enabling digital technologies such as machine learning. Consequently, this paper describes a framework based on the application of machine learning for delay mitigation in construction projects. The key areas identified for machine learning application include "cost estimation", "duration estimation", and "delay risk assessment". The developed framework is based on the CRISP-DM graphical framework. Relevant data were obtained to implement the framework in the three key areas identified, and satisfactory results were obtained. The machine learning methods considered include Multi Linear Regression Analysis, K-Nearest Neighbours, Artificial Neural Networks, Support Vector Machines, and Ensemble methods. Finally, interviews with professional experts were carried out to validate the developed framework in terms of its applicability, appropriateness, practicality, and reliability. The main contribution of this research is in its conceptualization and validation of a framework as a problem-solving strategy to mitigate construction delays. The study emphasized the cross-disciplinary campaign of the modern construction industry and the potential of machine learning in solving construction problems.
Publisher
International Council for Research and Innovation in Building and Construction
Subject
Computer Science Applications,Building and Construction,Civil and Structural Engineering
Reference76 articles.
1. Abd El-Razek M. E., Bassioni H. A. and Mobarak A. M. (2008). Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, Vol. 134 No. 11, 831-841.
2. Abdul Rahman H., Berawi M.A., Berawi A.R., Mohamed O., Othman M. and Yahya I.A. (2006). Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, Vol. 132, No. 2, 125–133.
3. Abdul‐Rahman H., Yahya I. A., Berawi M. A. and Wah L. W. (2008). Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, Vol. 26, No. 1, 15-27.
4. Abedi M., Fathi M.S. and Mohammad M.F. (2011). Major mitigation measures for delays in construction projects. Paper presented at the First Iranian Students Scientific Conference in Malaysia. Universiti Putra Malaysia, Malaysia, 9–10 April.
5. Adeli H. (2020). Four decades of computing in civil engineering. In CIGOS 2019, Innovation for Sustainable Infrastructure. Springer, Singapore, (pp. 3-11).
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献