Abstract
Delays in construction result in a multitude of negative effects on project performance, and severe dismays among participating parties. This study aims to digitize the traditional process of recording and managing the construction delays using Building Information Modeling (BIM). Extensive literature review followed by semi-structure interviews of 21 industry experts were carried out to identify the issues faced by construction stakeholders in managing construction delays. To resolve these issues, a plugin named BIM-based Construction Delays Recorder (BIM-CDR) is developed using Application Programming Interface (API) of the most commonly used BIM software i.e. Autodesk Revit. BIM-CDR provides a centralized repository, encompassing detailed information related to delays, which can be retrieved and visualized to analyze their impact on delay claims. To assess the effectiveness of BIM-CDR, a feasibility study is conducted with the experts’ review panel. The results revealed that BIM-CDR can record wide-ranging information related to all the significant issues causing delays on construction sites, and can help in effectively managing their corresponding claims. The advantages of the developed prototype include visualization of delays’ location, facilitation of delay analysis and effective delays management. Moreover, it also promotes transparency and speedy settlement of delay related claims without any unwanted disputes.
Publisher
International Council for Research and Innovation in Building and Construction
Subject
Computer Science Applications,Building and Construction,Civil and Structural Engineering
Reference59 articles.
1. Abd El-Razek, M., Bassioni, H. & Mobarak, A. (2008). Causes of delay in building construction projects in Egypt. Journal of construction engineering and management, 134, 831-841.
2. Akinade, O. O. (2017). BIM-based software for construction waste analytics using artificial intelligence hybrid models. Thesis, University of the West of England.
3. Akinade, O. O., Oyedele, L. O., Munir, K., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A. & Bello, S. A. (2016). Evaluation criteria for construction waste management tools: towards a holistic BIM framework. International Journal of Sustainable Building Technology and Urban Development, 7, 3-21.
4. Akintoye, A. & Skitmore, M. (1991). Profitability of UK construction contractors. Construction Management and Economics, 9, 311-325.
5. Alaghbari, W. e., Razali A. Kadir, M., Salim, A. & Ernawati (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14, 192-206.
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献