Abstract
Construction delays are a prevalent issue worldwide, and Saudi Arabia is just a short distance from this experience. Although the Saudi construction industry was booming due to Vision 2030, major delays were recorded in numerous construction projects, resulting in extra costs and schedule overruns. Studies on Building Information Modeling (BIM) have increased recently due to their crucial role in managing construction projects. However, more efforts need to be made to define the impact value of adopting BIM using advanced techniques such as System Dynamics (SD). It also aims to demonstrate the BIM impacts globally to encourage taking advantage of such a system. Limited papers studied BIM impact in-depth using advanced techniques such as SD. Thus, A questionnaire was distributed to fifty-nine experts to measure the extent of BIM’s influence on the ten factors affecting project delay times discovered in the literature. The statistical analysis results were used to calculate each factor’s relative importance index (RII), compare them to the results obtained without BIM use, and calculate the relative difference for each factor. These relative differences were considered in the modified SD. The modified SD was applied to a case study representing an academic building in the King Saud University campus. The main finding revealed that BIM decreased construction project delays by 14.55%. In addition, this study found that BIM has a maximum influence on poor site management and supervision by contractors, with a reduction percentage of 17.65%, and a minimum influence on lack of contractor experience and managerial skills, with 11.76%. The SD analysis results confirmed that BIM has a significant impact on reducing construction project delays.
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Reference60 articles.
1. A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects;Alajmi;Smart Cities,2022
2. Using PIPS to minimize causes of delay in Saudi Arabian construction projects: University case study;Alzara;Procedia Eng.,2016
3. Causes of delay in Saudi public construction projects;Alsuliman;Alex. Eng. J.,2019
4. MOE Ministry of Education (2023, May 28). Kingdom of Saudi Arabia, Available online: https://www.moe.gov.sa/ar/mediacenter/MOEnews/Pages/pr-1442-452.aspx.
5. Saudi Contractors Authority (2023, April 04). COVID-19 Impact on the Contracting Sector in Saudi Arabia Building Resilience in a Turbulent Environment. Available online: sca.sa/16052020091859.pdf.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献