Author:
Wu Ya-ping,Guo Jian,Guo Chun-xiang,Ma Wei,Wang Xiao-jun
Publisher
Zhejiang University Press
Reference20 articles.
1. Biggar, K.W., Sego, D.C., Stahl, R.P., 1996. Long-term pile load testing system performance in saline and ice-rich permafrost. Journal of Cold Regions Engineering, ASCE, 10(3):149–162. [doi:10.1061/(ASCE)0887-381X(1996)10:3(149)]
2. Comini, G., 1974. Finite element solution of nonlinear heat conduction problems with special reference to phase change. International Journal for Numerical Methods in Engineering, 35(8):613–624. [doi:10.1002/nme.1620080314]
3. Foriero, A., Ladanyi, B., 1995. FEM simulation of interface problem for laterally loaded piles in permafrost. Cold Regions Science and Technology, 23(2):121–136. [doi:10.1016/0165-232X(94)00008-L]
4. Huang, D.F., Wu, Y.P., 2004. Research on the Stability of Pile Foundation of Dry Bridge and Its Temperature Field. Research Report No. 003, Qinghai-Tibet Railway Corporation, p.65–69 (in Chinese).
5. Lai, Y.M., Li, J.J., Niu, F.J., Yu, W.B., 2003a. Nonlinear thermal analysis of Qing-Tibet railway embankments in cold regions. Journal of Cold Regions Engineering, ASCE, 17(4):171–184. [doi:10.1061/(ASCE)0887-381X(2003)17:4(171)]
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献