Updating parameters of an information model for road construction flow in work development project

Author:

Bobrova T. V.1ORCID

Affiliation:

1. Siberian State Automobile and Highway University (SibADI)

Abstract

Introduction. The article reflects the main trends and problems in the development of information modelling technology in the Russian road industry. A set of mutually integrated domestic software products is presented that provide the formation and support of information models of roads in the life cycle process. It has been established that the transition from traditional simulation modelling of building flows to information modelling of flow systems requires a detailed analysis of the lower elements of the flow structure. Such elements in the system of an integrated road construction flow include linear specialized detachments.Models and methods. A single information model of an object as part of the construction organization project (COP) forms the overall strategy for managing the construction of the road. At the stage of the project for the production of works (PPW), it is necessary to take into account the technical and technological features of the contractor in the calendar plan. At the PPW level, it is necessary to create a new structure and define the parameters of this structure in such a way as to satisfy the specified restrictions established by the COP in terms of time and costs,  and also provide for certain reserves for insuring possible risks.  The aim of the study is to develop a methodology for information modelling of a specialized road flow as part of the PPW, taking into account the optimization and updating of its parameters in relation to the conditions of the contracting organization.Results. A modelling algorithm has been developed for creating an updated structure of a specialized linear flow in an integrated computer environment, which provides visualization of a construction site, control and operational management of work in a shared data environment. An example of the implementation of this method is considered when designing a specialized flow, first as part of a COP, with the subsequent updating of this model in the MS Project program when developing a PPW based on a typical flow chart.Conclusion. The use of information modelling creates wide opportunities for analyzing and monitoring the progress of work at the construction site of a linear flow, and also allows you to perform prompt automated restructuring of the loading of detachment vehicles when adjusting the amount of work at the work sites.

Publisher

Siberian State Automobile and Highway University (SibADI)

Subject

General Medicine

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Development levels for time planning model ofroad constru ction at design stages;The Russian Automobile and Highway Industry Journal;2024-01-05

2. Complementary improvement of technological characteristics of asphalt concrete road surfaces using macromolecular nanocomposites;Nanotechnologies in Construction A Scientific Internet-Journal;2023-10-31

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3