Development levels for time planning model ofroad constru ction at design stages

Author:

Bobrova T. V.1ORCID,Pokalyukhina E. A.1ORCID

Affiliation:

1. Siberian State Automobile and Highway University

Abstract

Introduction. The experience of Russian computer companies in the field of information modelling technologies (IMT) in construction is analyzed. The attention to the role of standardization and classification of construction information (CSI) for coding elements of the digital information model (DIM) at the stages of organizational design and calendar planning is drawn. The specificity of linear objects with respect to the level of elaboration of model elements and their attribute characteristics at different planning levels is noted. Models and methods. The necessity of an individual approach to the decomposition of road structure elements taking into account the complex of natural and man-made factors is substantiated. At different stages of designing the organization of road construction, the timetable with different degrees of detail depending on the design objectives and available information about the object is presented. The parameters of specialized flows of a linear object, limitations and criteria for the optimality of the calendar plan at the design stage of the construction organization (CO) are determined. The level of elaboration of the model elements at the stage of work production by the contracting organization has been increased. The developed algorithm for forming a complex flow graph in the form of a flowchart and a DIM is presented.Results. The use of the method is considered on the examples of structuring the elements of the object and technological processes at the stage of work production by the contracting organization, taking into account different options and schemes for organizing the work of specialized streams. The design results are presented in the form of a calculation matrix, a cyclogram and a Gantt graph in the MS Project program.Discussion and conclusion. The development of the basic information for the model of the calendar plan for the construction of a road at different stages of design in an integrated general data environment is presented. The use of linear road is justified.  zoning as a method of decomposition of a linear object at the stages of CAD, POS and work production by the contracting organization. The structural elements of the design at the final stage (work production by the contracting organization) are linear design and technological modules and specialized flows formed on the basis of maps of labor processes of the contracting organization.

Publisher

Siberian State Automobile and Highway University (SibADI)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3