1. Abrahamson, N. A., Birkhauser, P., Koller, M., Mayer-Rosa, D., Smit, P., Sprecher, C., Tinic, S., and Graf, R., 2002. PEGASOS: A comprehensive probabilistic seismic hazard assessment for nuclear power plants in Switzerland, inProceedings, 12th European Conference on Earthquake Engineering, paper 633, London.
2. On the Use of Logic Trees for Ground-Motion Prediction Equations in Seismic-Hazard Analysis
3. Coppersmith, K. J., and Youngs, R. R., 1986. Capturing uncertainty in probabilistic seismic hazard assessments within intraplate tectonic environments, inProceedings, 3rd U.S. National Conference on Earthquake Engineering, vol. 1, Charleston, N.C., pp. 301–312
4. Kulkarni, R. B., Youngs, R. R., and Coppersmith, K. J., 1984. Assessment of confidence intervals for results of seismic hazard analysis, inProceedings, 8th World Conference on Earthquake Engineering, vol. 1, San Francisco, Calif., pp. 263–270
5. Reiter, L., 1990.Earthquake Hazard Analysis: Issues and Insights, Columbia University Press, New York, 254 pp.