Author:
Poongothai V.,Godhandaraman P.,Jenifer A. Arockia
Reference15 articles.
1. J. Blazewich, K. Ecker, E. Pesch, G. Schmidt and J. Weglarz, “Scheduling Computer and Manufacturing Systems”, (Springer, Berlin, 1996).
2. Exploration of finite production rate model with overtime and rework of nonconforming products
3. A bi-objective model for the single-machine scheduling problem with rejection cost and total tardiness minimization
4. C. E. Ebeling, “An introduction to reliability and maintainability engineering”, (McGraw-Hill, USA, 1997).
5. On the identical parallel-machine rescheduling with job rework disruption
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献