Author:
Utomo Sonni Joko,Saputra Pungky Dharma
Reference21 articles.
1. Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Cost for Precast Concrete Bridge Construction Projects. Case Study: Girder Erection with Launching Gantry Method
2. Analysis of safety cost structure in infrastructure project of precast of precast concrete bridge based on Work Breakdown Structure (WBS)
3. MOC. Explanatory Note for Variation Order Request No. 004 Change in the Cable Length and Rating (Sizing) due to Change in The Location of DEG Room, 2018
4. MOC. Explanatory Note for Claim Related to The Provision of Temporary 20 KV Power Supply, Rev. 01, 2018
5. MOC. Explanatory Note for the Contractor's Claim No. 043 Extended and Additional Warehouse/Storage Cost, 2018