Analysis of safety cost structure in infrastructure project of precast of precast concrete bridge based on Work Breakdown Structure (WBS)

Author:

Saputra P D,Latief Y

Abstract

Abstract The Indonesian construction industry has increased due to the policy of infrastructure projects acceleration. Construction is a dangerous industry that often takes casualties. In recent years there have been many accidents in the precast bridge projects, which have caused moral and material losses, projects were stopped and delayed. Separate budgets that are not specifically prepared in implementing the Occupational Safety and Health Management System (OHSMS) is one of the causes of the poor implementation of OHSMS and create high rates of accidents. Thus, the financing of OHSMS was taken from the project budget, which led to a reduction in the profits. The aims of the study are determining the work breakdown structure (WBS) in precast bridge project, identifying hazards and risks, developing safety plans, identifying safey costs components and calculating of safety cost. This research is a survey research with respondents of experts in construction safety, descriptive analysis is used to determine variables. A case study approach is also used to calculate safety costs. The results of this study are the precast bridges standardized WBS, safety plan to each hazards and activity, finding the safety costs components based on WBS, and the percentage of total safety cost Kundur Bridge is 3,21%.

Publisher

IOP Publishing

Subject

General Medicine

Reference26 articles.

1. WBS-based Risk Identification for the Whole Process of Real Estate Project and Countermeasures;Su,2012

2. A practical tool for estimating compulsory OHS costs of residential building construction projects in Turkey;Yılmaz,2018

3. Critical Success Factors for Safety Program Implementation among Construction Companies in Saudi Arabia;Haadir;Procedia Engineering,2011

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Development of Work Breakdown Structure (WBS) for Rapid Damage Runway Repair (RADARR) Time Planning at Military Airbases;E3S Web of Conferences;2024

2. Identification of T – pier construction work activities on the elevated railway project to develop work breakdown structure;INTELLIGENT BIOTECHNOLOGIES OF NATURAL AND SYNTHETIC BIOLOGICALLY ACTIVE SUBSTANCES: XIV Narochanskie Readings;2023

3. Identification of high safety risks in box girder bridge construction to develop a safety plan for elevated railway projects;INTELLIGENT BIOTECHNOLOGIES OF NATURAL AND SYNTHETIC BIOLOGICALLY ACTIVE SUBSTANCES: XIV Narochanskie Readings;2023

4. Identification of factors that affect the delay in the production cycle time of precast box girder;3RD INTERNATIONAL CONFERENCE OF BIO-BASED ECONOMY FOR APPLICATION AND UTILITY;2023

5. Identification of factors that cause time and cost claims on the underground station construction works;3RD INTERNATIONAL CONFERENCE OF BIO-BASED ECONOMY FOR APPLICATION AND UTILITY;2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3