Preliminary Study of Green Design and Project Delivery Methods in the Public Sector

Author:

Bilec Melissa1,Ries Robert1

Affiliation:

1. Department of Civil and Environmental Engineering, University of Pittsburgh, 949 Benedum Hall, Pittsburgh, PA, 15261.

Abstract

The selection of the project delivery method (PDM) for any project is critical—it establishes the communication, coordination, and contractual interfaces between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. While it is reasonable to assume that a relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, team-based collaborative project; it is also appropriate to understand the relationship between green design and other PDMs. This preliminary research examined possible relationships between design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of beginning to identify potential positive correspondence between them. To develop an initial understanding, two main tasks were completed. First, existing published research was evaluated to reveal aspects of projects and PDMs independent of green design. Second, the research collected primarily qualitative information by conducting structured interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. Upon completion of the structured interviews, responses from the interviews were reviewed for green design project characteristics. Additionally, the interviews provided insight on the initial understanding of the current state of knowledge and experience in green design and PDMs. After the two main tasks were completed, both were evaluated for commonalities. Preliminary results found that seven green design project characteristics emerged that in some cases related to a specific PDM, but in other cases were independent of a PDM. Future research will quantitatively investigate the relationship between green design projects, PDMs, and success factors.

Publisher

College Publishing

Subject

General Environmental Science,Geography, Planning and Development,Civil and Structural Engineering,Building and Construction,Architecture,Environmental Engineering,Management, Monitoring, Policy and Law,Nature and Landscape Conservation,Public Health, Environmental and Occupational Health

Reference12 articles.

1. Examination of the correlation of critical success and delay factors in construction projects in the Kingdom of Saudi Arabia

2. Critical Success Factors for Different Project Objectives

3. April 2

4. Project Delivery Systems and Project Change: Quantitative Analysis

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3