Affiliation:
1. Yokohama National University
Subject
Metals and Alloys,Surfaces, Coatings and Films,Mechanical Engineering,Mechanics of Materials
Reference8 articles.
1. 1) S. Hartmann, D. Briskorn: A survey of variants and extensions of the resource-constrained project scheduling problem, European Journal of Operational Research, 207-1 (2010), 1-14, https://doi.org/10.1016/j.ejor.2009.11.005.
2. 2) K. Nonobe, T. Ibaraki:Formulation and Tabu Search Algorithm for the Resource Constrained Project Scheduling Problem : RCPSP (Algorithm Engineering as a New Paradigm), 数理解析研究所講究録, 1120 (1999), 88-97. (in Japanese)
3. 3) T. Mitsuyuki, K. Hiekata, H. Yamato: Design of production strategy considering the cutting peak demand of electricity in the shipbuilding industry, Journal of Marine Science and Technology, 19-4 (2014), 425-437 https://doi.org/10.1007/s00773-014-0261-6.
4. 4) H. Kajiwara, H. Kimura, I. Ishikawa, H. Yamada, Y. Dakeshita, S. Nakashima, Process Scheduling of a Shipbuilding Stockyard based on RCPSP Approach, Journal of the Japan Society of Naval Architects and Ocean Engineers, 31 (2020), 183-194 https://doi.org/
10.2534/jjasnaoe.31.183. (in Japanese)
5. 5) Y. Okubo, T .Mitsuyuki: Study on Job Shop Scheduling for Keeping the Requested Shipping Sequence by Production System Modeling and Backward Simulation, Proceeding of the 28th ISPE Inc. International Conference on Transdisciplinary Engineering, 16 (2021), 203-212 .