Author:
Kajiwara Hiroyuki,Kimura Hajime,Ishikawa Ichiro,Yamada Hirofumi,Dakeshita Yuusuke,Nakashima Shougo
Publisher
Japan Society of Naval Architects and Ocean Engineers
Reference10 articles.
1. 1) Kajiwara, H., Hitoi, Y., Nakao, Y., Iwashita, T.: Max-plus-algebra based scheduling of ship building lines for tandem construction of a pair of ships, Journal of the Japan Society of Naval Architects and Ocean Engineers, vol.20, pp.205-220, 2014 (in Japanese).
2. 2) Iwashita, T., Kajiwara, H.: Heap-model-based scheduling of ship building lines for tandem construction of a pair of ships, vol.21, pp.83-92, 2015 (in Japanese).
3. 3) Christian Artigues, Sophie Demassey, Emmanuel Néron: Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications, Wiley, 2008.
4. 4) Yamasaki, M.: Shipbuilding Technology and Production System, Seizando-Shoten Publishing Co., Ltd., 1995 (in Japanese).
5. 5) Okumot, Y.: Shipbuilding Technology and Producyion System, Seizando-Shoten Publishing Co., Ltd., 2009 (in Japanese).
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献