1. P J Ye, J C Huang, Z Z Sun, et al. The process and experience in the development of Chinese lunar probe. Sci. Sin. Tech., 2014, 44(6): 543–558. (in Chinese)
2. V Belser, J Breuninger, R Laufer, et al. Aerodynamic and engineering design of a 1.5 seconds high quality microgravity drop tower facility. Acta Astronautica, 2016, 129(1): 335–344.
3. J Zhao, N Liu, B Wu. Human motion simulation comparison research between neutral buoyancy and weightless environment. Manned Spaceflight, 2014, 20(6): 517–519. (in Chinese)
4. P Yang, H T Wu, X L Yang, et al. Study of 6 DOF microgravity simulation platform. Machinery Design & Manufacture, 2015, 3: 5–10. (in Chinese)
5. L F Li, Z Q Deng, H B Gao, et al. Active gravity compensation test bed for a six-DOF free-flying robot. 2015 IEEE International Conference on Information and Automation, Lijiang, China, August 8–10, 2015: 3135–3140.