AbstractThis paper presents an experimental investigation of the plugging efficiency of aggregate pouring through multiple boreholes under flowing water conditions into an inundated mine tunnel. Aggregate pouring into an inundated mine tunnel has been widely used and constitutes the premise for the salvage of flooded underground mines through further grouting. However, corresponding in-depth research is relatively limited due to the concealment of underground engineering. A visual experimental setup for aggregate pouring into a tunnel replica was built based on the theory of similarity between sediment movement and slurry pipeline transportation. Four factors, each with four levels, including the aggregate particle size (0.25–0.5, 0.5–1, 1–2 and 2–5 mm), distance between boreholes (0.5, 0.75, 1 and 1.5 m), initial water flow rate (0, 1.5 × 10−2 m/s, 2.4 × 10−2 m/s and 3 × 10−2 m/s) and tunnel inclination (0°, 3°, 5° and 8°) were selected in orthogonal experiments to investigate the plugging efficiency. Range and variance analysis of the four-level orthogonal array experimental results indicated that the factors influencing the plugging efficiency, varying between 83.96 and 98.15%, could be ranked in descending order as the initial water flow rate, aggregate particle size, distance between boreholes and tunnel inclination. The former two factors yielded a more significant influence than that of the latter two factors. The measured water pressure difference ranging from 16 to 32% between the front and back ends of the formed aggregate mass in the pouring process indicated that there remained a high resistance to water flow, even if the aggregate mass was not capped but reached a certain length. Plugging criteria for aggregate pouring into horizontal and inclined tunnels were then proposed. Moreover, the optimal distance between boreholes to form an effective bulkhead was determined, which could be defined as the distance between boreholes when the aggregate mass exhibits the fastest build-up and the plugging capacity is reached.

Funder

Natural Science Foundation of China

Publisher

Springer Science and Business Media LLC

Subject

Management, Monitoring, Policy and Law,Geotechnical Engineering and Engineering Geology,Environmental Science (miscellaneous),Safety, Risk, Reliability and Quality,Geography, Planning and Development

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3