1. “Important issues in cuttings transport for drilling directional wells”, SPE 39020;Azar,1997
2. Understanding the effect of drilling parameters on hole cleaning in horizontal and deviated wellbores using CFD” SPE 111208;Bilgesu,2007
3. A three-layer modeling for cuttings transport with coiled tubing horizontal drilling”, SPE 63269;Cho,2000
4. A comparative study of hole cleaning performance — water versus drag reducing fluid”, OMAE2014–24083;Corredor,2014
5. Experimental investigation of drag reducing fluid flow in annular geometry using particle image velocimetry (PIV) technique;Corredor;ASME Trans. J. Fluids Eng.,2015