The assessment of quantitative risk to road users from debris flow

Author:

Winter M. G.ORCID,Wong J. C. F.

Abstract

Abstract Background A methodology for the quantitative risk assessment (QRA) of the impact of debris flow in a road environment has been developed and applied to two sites that are typically subject to high frequency-low magnitude and low frequency-high magnitude events. The methodology considers the probability of an event of a typical size, and the conditional probabilities of a vehicle being affected, given an event, and of damage (fatality) occurring given that the vehicle is affected. Scenarios covering a vehicle being hit by a debris flow and of a vehicle hitting a debris flow are considered. The computed Personal Individual Risk (PIR) is used to calculate worst case fatality probabilities for commuters and logistics truck drivers. The overall risk to society is expressed both by the annual probability of fatality amongst all road users, the Potential Loss of Life (PLL), and using the F-N diagram and is used to demonstrate the effect of a programme of management and mitigation works on the societal risk at one of the sites. The authors believe that this is the first full, formal quantitative risk assessment for debris flow risk to road users. Results The PIR for a single trip through the sites ranges between 1.147E-10 for the low frequency-high magnitude site and 1.583E-09 for the high frequency-low magnitude site. These figures increase to 1.248E-07 and 1.922E-06, respectively, when more frequent travellers are considered. The PLL for the two sites ranges between 2.616E-04 for the low frequency-high magnitude site and 4.083E-03 for the high frequency-low magnitude site. The F-N diagrams illustrate the Broadly Acceptable level of risk at the low frequency-high magnitude site and the partially Unacceptable level of risk at the high frequency-low magnitude site. The risk at the high frequency-low magnitude site is reduced to ALARP levels when management and mitigation measures extant as of October 2014 are considered. Conclusions The QRA proves an effective technique for understanding, comparing and articulating the differences in levels of risk and the temporal changes in risk at a given site as a result of landslide risk reduction activities.

Funder

Transport Scotland

Publisher

Springer Science and Business Media LLC

Subject

Management, Monitoring, Policy and Law,Geotechnical Engineering and Engineering Geology,Environmental Science (miscellaneous),Safety, Risk, Reliability and Quality,Geography, Planning and Development

Reference42 articles.

1. Ale BJM (2005) Tolerable or acceptable: a comparison of risk regulation in the United Kingdom and the Netherlands. Risk Anal 25(2):231–241

2. Anon. (1992) The tolerability of risk from nuclear power stations (revised). HMSO, London

3. Anon. 2013. A83 trunk road route study: part a – A83 rest and be thankful. Final report. Report prepared by Jacobs for transport Scotland, 212p. (Accessed 1 Feb 2014: http://www.transportscotland.gov.uk/road/maintenance/landslides)

4. Barnett C, Perry M, Hossell J, Hughes G, Procter C (2006a) A handbook of climate trends across Scotland; presenting changes in the climate across Scotland over the last century. 58p. SNIFFER Project CC03. Scotland and Northern Ireland forum for environmental research, Edinburgh

5. Barnett C, Perry M, Hossell J, Hughes G, Procter C (2006b) Patterns of climate change across Scotland: technical report, 102p. SNIFFER project CC03. Scotland and Northern Ireland Forum for Environmental Research, Edinburgh

Cited by 20 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3