Abstract
AbstractCementing operations in wellbores, especially for long casings, are often challenging and prone to deficiencies when not properly planned and executed. While exploring for and exploiting of geothermal resources at temperatures above the critical point of water was attempted in different drilling projects in recent years, the well design, and especially the procedure to run and cement long production casings became a key challenge for drilling engineers. For the first time, a reverse cementing job for a 2.97 km long production casing in a high-temperature geothermal well could be monitored and analyzed using a combination of permanently installed distributed fiber optic and electronic sensors as well as conventional well logging equipment. Data from the permanently installed sensors were used to monitor and evaluate the cementation process as well as the onset of the cement hydration. Based on the data, the understanding of downhole fluid dynamics during cementation could be improved. Our analysis suggests that the cement was diluted during cement placement and partly lost into the formation. These findings can help to better prepare for future drilling ventures under similar downhole conditions.
Funder
Horizon 2020 Framework Programme
Seventh Framework Programme
Projekt DEAL
Publisher
Springer Science and Business Media LLC
Subject
Economic Geology,Geotechnical Engineering and Engineering Geology,Renewable Energy, Sustainability and the Environment
Reference32 articles.
1. Allouche M, Guillot D, Hayman AJ, Butsch RJ, Morris CW. Well Cementing 2nd Edition. Schlumberger. 2006:562–563.
2. Teodoriu C, Falcone G. Comparing completion design in hydrocarbon and geothermal wells: The need to evaluate the integrity of casing connections subject to thermal stresses. Geothermics. 2009;38:238–46. https://doi.org/10.1016/j.geothermics.2008.11.006
3. Salim P, Amani M. Special considerations in cementing high pressure high temperature wells. International Journal of Engineering and Applied Sciences. 2012;1.https://doi.org/10.1007/978-94-009-9059-3
4. Bertani R, Büsing H, Buske S, Dini A, Hjelstuen M, Luchini M, et al. The first results of the Descramble project. In: Proceedings, 43rd workshop on geothermal reservoir engineering, Stanford University, Stanford, California. 2018.
5. Pálsson B, Hólmgeirsson S, Gudmundsson A, Bóasson HA, Ingason K, Sverrisson H, et al. Drilling of the well IDDP-1. Geothermics. 2014. https://doi.org/10.1016/j.geothermics.2013.08.010
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献