Abstract
AbstractFace stability control of excavation with earth pressure balance machine (EPB) approach is the best available method to reduce the ground deformation and settlement of surface structures in a tunneling project in urban areas. In the present paper, several models have proposed through a statistical method, including feed-forward stepwise regression (FSR) and machine learning techniques such as support vector machine (SVM), Takagi–Sugeno fuzzy model (TS), and multilayer perceptron neural network (ANN-MLP), to provide a predictive strategy for EPB machine during the tunnel excavation. For this purpose, a monitoring dataset of machine performance parameters including advance speed, screw conveyor speed, screw conveyor torque, thrust force, and cutterhead rotation speed from Tehran Metro Line 6 Southern Extension Sector (TML6-SE) has been compiled. Then, the relation between the performance parameters and target values were investigated to analyze the available inputs and offer a new equation using the FSR. Moreover, evaluation metrics and loss functions were utilized for the evaluation of the developed models’ efficiency. The results proved the significance of the presented methods in this paper that could be used to predict the earth pressure balance operation with high efficiency.
Publisher
Springer Science and Business Media LLC
Subject
Energy (miscellaneous),Mechanics of Materials,Geotechnical Engineering and Engineering Geology
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献