Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference21 articles.
1. Estimation of convergence of high speed railway tunnel in weak rocks using an adaptive neuro-fuzzy inference system (ANFIS) approach;Adoko;J. Rock Mech. Geotech. Eng.,2012
2. Bouayad, D., Emeriault, F., 2013. Application of ANFIS method for prediction of surface settlements induced by a slurry shield tunnel boring machine. In: Proceeding of the 3rd Int. Conf. on Computational Methods in Tunneling and Subsurface Engineering, Bochum, Germany, pp. 649–654.
3. Assessment of ground surface displacements induced by an earth pressure balanced shield tunneling using partial least squares regression;Bouayad;J. Environ. Earth Sci.,2014
4. Bouayad, D., Emeriault, F., 2014. Application of the hybrid PCA/ANFIS method for the prediction of surface settlement induced by an EPB TBM with consideration of the encountered geology. In: Proceeding of the 8th European Conference on Numerical Methods in Geotechnical Engineering, Delft, Netherlands, vol. 1, pp. 333–338.
5. Artificial neural network application for the prediction of ground surface movements induced by shield tunneling;Boubou;Can. Geotech. J.,2010
Cited by
96 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献