1. Optimization of the pumping schedule in aquifer remediation under uncertainty;Andricevic;Water Resour. Res.,1990
2. Bachman , G. O. Karst evaporites in southwestern New Mexico Albuquerque, N.M. 1987
3. Beauheim , R. L. Hydraulic-test interpretations for well DOE-2 at the Waste Isolation Pilot Plant (WIPP) site Albuquerque, N.M. 1986
4. Beauheim , R. L. Analysis of pumping tests of the Culebra dolomite conducted at the H-3 hydropad at the Waste Isolation Pilot Plant (WIPP) site Albuquerque, N.M. 1987
5. Beauheim , R. L. Interpretations of single-well hydraulic tests conducted at and near the Waste Isolation Pilot Plant (WIPP) site, 1983-1987 Albuquerque, N.M. 1987