As an effective way of flood prevention it is widely accepted to construct flood embankments. These structures are getting bigger as the river changes from meandring to successive development of floodplain and narrowing the embankment. Meanwhile, it is worth returning old solutions and reactivating old floodplain polders. There are currently three polders on the central Odra River: Kiełcz-Tarnów-Bycki – with a capacity of approximately 15 million m3, Połupin – with a capacity of 70 million m3 and Krzesin-Bytomiec – with a capacity of 20 million m3. Three further reservoirs are designed in: Urad – 30 million ha, Słubice Górzyca – 60 million ha and Ługi Górzyckie – 30 million ha. The authors propose additionally a reactivation of seven archival polders, with total capacity of approximately 4.9 million m3.
Reference16 articles.
1. 1. Borys M., Rycharska J.: Stan obwałowań przeciwpowodziowych w Polsce. 12 Międzynarodowa Konferencja Technicznej kontroli zapór, Stare Jabłonki, Warszawa, IMGW 2007.
2. 2. Chrzan T.: Zarządzanie kryzysowe i zabezpieczenie przeciwpowodziowe na terenie powiatu kluczborskiego a poczucie bezpieczeństwa jego mieszkańców. Logistyka, 5 (2015) 737-742.
3. 3. Hudak M., Karczmar C., Kołodziejczyk U., Kostecki J.: Flood protection on the Odra River in the segment between Nowa Sól and Cigacice, Civil and Environmental Engineering Reports, 28, 1 (2018) 54-63.
4. 4. Hudak M., Kołodziejczyk U.: Ocena stanu obiektów hydrotechnicznych rzeki Ołobok na obszarze Międzyrzeckiego Rejonu Umocnionego. Gospodarka Wodna, 12 (2017) 413-418.
5. 5. Hudon C.: Impact of water level fluctuations on St. Lawrence River aquatic vegetation, Canadian Journal of Fisheries and Aquatic Sciences, 54, 12 (1997) 2853-2865.