Abstract
Abstract
The aim of this paper was to compare the level of performance (success) of construction projects between selected countries based on the concept of iron triangle. Following this, the major construction delays, cost overruns and quality factors were identified through an in-depth review of previous research works conducted in Denmark, Nigeria and Gaza Strip. The aggregate impacts of these factors were computed and compared between these countries. The results show that in the case of Denmark, the aggregate impact of the factors responsible for delay, cost overrun and poor quality was found in the impact interval between [0.60–0.80], but in the case of Gaza Strip and Nigeria, the aggregate impacts were found in the impact interval between [0.80–1.0]. This shows that construction projects in Denmark are found to be performed better relative to Nigeria and Gaza Strip.
Subject
Management of Technology and Innovation,Organizational Behavior and Human Resource Management,Strategy and Management,Building and Construction,Civil and Structural Engineering
Reference40 articles.
1. Abbas, G., & Painting, N. (2017). Significant factors causing cost overruns in the construction industry in Afghanistan. Procedia Engineering, 182, pp. 510–517. doi: 10.1016/j.proeng.2017.03.145
2. Abdel-Razek, R. H. (2012). Engineering, construction and architectural management article information : To cite this document : Users who downloaded this article also downloaded : About www.emeraldinsight.com Factors affecting construction quality in Egypt : identification. Engineering, Construction and Architectural Management, 5(3), pp. 220–227.
3. Abisuga, A. O., Amusu, O. R. O., & Salvador, K. A. (2017). Construction delay in Nigeria : A perception of indigenous and multinational construction firms construction delay in Nigeria : A perception of indigenous and multinational construction firms department of building technology. Journal of Emerging Trends in Economics and Management Sciences, 5(3), pp. 371–378.
4. Agbenohevi, C. S., Amoatey, C. T., Adaku, E., & Famiyeh, S. (2017). Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2).
5. Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667–677.