Major causes of construction time and cost overruns

Author:

Famiyeh Samuel,Amoatey Charles Teye,Adaku Ebenezer,Agbenohevi Collins Sena

Abstract

Purpose In Ghana, the duration of construction projects from inception to completion is becoming a great concern, recently, especially among clients and beneficiaries, because of the rising interest rates, inflation, development plan targets, among other factors. Hence the need to understand the causes of delays and cost overrun in the construction sector has become more important than ever. This study therefore aims to identify the major factors underlying time and cost overruns in projects related to the education sector in Ghana to proffer practical solutions in addressing them. Design/methodology/approach The study conducted a survey among clients’ consultants and representatives of the contractors working on about 60 government school projects. A relative importance index was used to determine the relative effects of the factors causing construction time and cost overruns. Findings The key factors causing construction time overrun were: financial problems, unrealistic contract durations imposed by clients, poorly defined project scope, client-initiated variations, under-estimation of project cost by consultants, poor inspection/supervision of projects by consultants. Other factors were underestimation of project complexity by contractors, poor site management, inappropriate construction methods used by contractors and delays in the issuance of permits by government agencies. Factors affecting cost overruns were financial difficulty by client, delays in payments of completed works, variations in designs, lack of communications plans, poor feasibility and project analysis, poor financial management on site and material price fluctuations. Research limitations/implications The research was limited to only the educational sector projects. Practical implications Practically, this study highlights for the construction sector the critical factors causing project time and cost overruns in Ghana. Identification of these factors provides the basis for pragmatic solutions to enhance the chances of project success. Social implications The identification and solutions to project time and cost overruns, especially for educational sector projects, contribute toward making public goods more affordable and accessible to most citizens, particularly in developing countries. Originality/value This study contributes to the debate on factors causing project time and cost overruns in the construction sector especially from a developing country’s perspective.

Publisher

Emerald

Subject

General Engineering

Reference68 articles.

1. Agyakwa-Baah, A. (2007), “Stakeholders’ perception of the causes of delay on construction projects”, Unpublished B.Sc. Project Dissertation, Kwame Nkrumah Universities of Science and Technology, Kumasi.

2. Agyakwa-Baah, A. (2009), “A study into risk assessment and management practices within ghanaian medium and large construction organizations”, Unpublished M.Sc. Dissertation, Built Environment Division, Sheffield Hallam University, Sheffield.

3. The effects of construction delays on project delivery in Nigerian construction industry;International Journal of Project Management,2002

4. Construction delays and their causative factors in Nigeria;Journal of Construction Engineering and Management,2006

Cited by 100 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3