Efficient Procedure to Scheduling Construction Projects at the Planning Phase

Author:

Tsegaye Matiwos1

Affiliation:

1. Amhara Construction Design and Supervision Enterprise , Bahirdar , Ethiopia

Abstract

Abstract The construction industry is one of the most important activities that contributes towards the economic growth of any nation. However, the sector has been experiencing problems of cost and time overruns, particularly the problems are significant for the lowest-bid awarded construction projects in the developing countries where inappropriate planning is reported to be one of the major causes. Thus, the paper aims at developing an integrated scheduling approach for construction projects during the planning phase from a project owner’s perspective. The proposed approach integrates cost estimation and schedule in light of practical activity precedence and mathematical cost optimization using different project commencement dates. The study has shown that cost and time optimization model could yield impractical results unless double precedence relations (start-to-start plus finish-to-finish) are imposed between some activities such as trench excavation and pipe laying. It has also demonstrated that the cost and time budgeted during the planning phase would substantially deviate from actual if the planned construction start date slips from the plan, particularly for short period projects. The proposed approach demonstrated in the paper can sufficiently allow planning engineers to develop a comprehensive construction schedule so that the cost and time overruns in the lowest-bid awarded construction projects can be reduced. The paper provides empirical insights into how a robust construction schedule is developed from an owner’s perspective. Cost-time optimization and risk analysis results obtained from manual computation might reduce the reasonable accuracy of the desired cost and schedule integration unless each activity is assigned its own calendar.

Publisher

Walter de Gruyter GmbH

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3