1. EPRI (1995) Option Pricing for Project Evaluation: An Introduction. TR-104755, Project 1920-05, Final Report, Electric Power Research Institute, January
2. Optimal timing of transmission line investments in the face of uncertain demand;Martzoukos;energy economics,1992
3. Capital expenditures for electric power in the developing countries in the 1990s;Moore,1990
4. Sanghvi, A and Vernstrom, R with Besant-Jones, J (1989) Review and evaluation of historic electricity forecasting experience (1960–1985) Energy Series Paper 18. World Bank, Industry and Energy Department, Washington, DC
5. Geological Problems and Cost Overruns,1984