Abstract
Abstract
In urban areas, the control of ground surface settlement is an important issue during shield tunnel-boring machine (TBM) tunneling. These ground movements are affected by many machine control parameters. In this article, a finite difference (FD) model is developed using Itasca FLAC-3D to numerically simulate the whole process of shield TBM tunneling. The model simulates important components of the mechanized excavation process including slurry pressure on the excavation face, shield conicity, installation of segmental lining, grout injection in the annular void, and grout consolidation. The analysis results from the proposed method are compared and discussed in terms of ground movements (both vertical and horizontal) with field measurements data. The results reveal that the proposed 3D simulation is sufficient and can reasonably reproduce all the operations achieved by the TBM. In fact, the results show that the TBM parameters can be controlled to have acceptable levels of surface settlement. In particular, it seems that moderate face pressure can reduce ground movement significantly and, most importantly, can prevent the occurrence of face-expected instability when the shield crosses very weak soil layers. The shield conicity has also an important effect on ground surface settlement, which can be partly compensated by the grout pressure during tail grouting. Finally, the injection pressure at the rear of the shield significantly reduces the vertical displacements at the crown of the tunnel and, therefore, reduces the settlement at the ground surface.
Subject
Computers in Earth Sciences,Mechanics of Materials,Geotechnical Engineering and Engineering Geology,Civil and Structural Engineering
Reference23 articles.
1. Benmebarek, S., Kastner, R. & Ollier, C. (1998). Auscultation et modélisation numérique du processus de creusement à l’aide d’un tunnelier. Geotechnique 48 (6), 801–818. (in french).
2. Chakeri H., Ozcelik, Y. & Unver B. (2013). Effects of important factors on surface settlement prediction for metro tunnel excavated by EPB. Tunnelling and Underground Space Technology 36, 2013, pp. 14-23.
3. Demagh, R., Emeriault, F. & Hammoud, F. (2013). 3D modelling of tunnel excavation using pressurized tunnel boring machine in overconsolidated soils. Studia Geotechnica et Mechanica, Vol 35, No. 2
4. Dias, D., Kastner, R. & Maghazi, M. (2000). 3D simulation of slurry shield tunnelling. Proceedings of International Symposium on Geotechnical aspects of underground construction in soft ground Kusakabe, Balkema, Rotterdam, 351-356.
5. Dias, D. and Kastner, R. (2013). Movements caused by the excavation of tunnels using face pressurized shields — Analysis of monitoring and numerical modeling results. Engineering Geology Vol. 152, pp. 17–25.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献