Affiliation:
1. Admiral Makarov National University of Shipbuilding , Ukraine
2. Gdańsk University of Technology , Poland
Abstract
Abstract
This investigation is devoted to an analysis of the working process in a dual-fuel low-emission combustion chamber for a floating vessel’s gas turbine. The low-emission gas turbine combustion chamber with partial pre-mixing of fuel and air inside the outer and inner radial-axial swirlers was chosen as the object of research. When modelling processes in a dual-flow low-emission gas turbine combustion chamber, a generalized method is used, based on the numerical solution of the system of conservation and transport equations for a multi-component chemically reactive turbulent system, taking into consideration nitrogen oxides formation. The Eddy-Dissipation-Concept model, which incorporates Arrhenius chemical kinetics in a turbulent flame, and the Discrete Phase Model describing the interfacial interaction are used in the investigation. The obtained results confirmed the possibility of organizing efficient combustion of distillate liquid fuel in a low-emission gas turbine combustion chamber operating on the principle of partial preliminary formation of a fuel-air mixture. Comparison of four methods of liquid fuel supply to the channels of radial-axial swirlers (centrifugal, axial, combined, and radial) revealed the advantages of the radial supply method, which are manifested in a decrease in the overall temperature field non-uniformity at the outlet and a decrease in nitrogen oxides emissions. The calculated concentrations of nitrogen oxides and carbon monoxide at the flame tube outlet for the radial method of fuel supply are 32 and 9.1 ppm, respectively. The results can be useful for further modification and improvement of the characteristics of dual-fuel gas turbine combustion chambers operating with both gaseous and liquid fuels.
Subject
Mechanical Engineering,Ocean Engineering
Reference35 articles.
1. 1. Offshore Technology (2018): Report: 55 FPSOs to start operations by 2022. Retrieved from https://www.offshore-technology.com/news/report-55-fpsos-start-operations-2022/.
2. 2. Offshore Magazine (2002): Leadon FPSO delivered on time, complete, within budget. Retrieved from https://www.offshore-mag.com/production/article/16759844/leadon-fpso-delivered-on-time-complete-within-budget.
3. 3. ENI (2016): Block 15-06 East Hub Development Project. Retrieved from https://www.eni.com/docs/en_IT/enicom/publications-archive/publications/brochures-booklets/countries/brochure_eni_angola_ese_web.pdf.
4. 4. Aker Floating Production (2009): FPSO Dhirubhai-1. Retrieved from http://www.akerfloatingproduction.com/s.cfm/3-12/FPSO-Dhirubhai-1-Operation.
5. 5. Cherednichenko O., Serbin S., Dzida M. (2019): Application of Thermo-Chemical Technologies for Conversion of Associated Gas in Diesel-Gas Turbine Installations for Oil and Gas Floating Units. Polish Maritime Research, 3(103), Vol. 26, 181–187.10.2478/pomr-2019-0059
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献