1. Galić, I., Janković, B., and Mrakovčić, I., Another Way for Open Pit Mine Design Optimization–Floating Slopes Method,Rudarsko-geološko-naftni zbornik, 2009, vol. 21, no. 1, pp. 103–111.
2. Parra, A., Morales, N., Vallejos, J., and Nguyen, P.M.V., Open Pit Mine Planning Considering Geomechanical Fundamentals, Int. J. of Min., Reclamation and Environment, 2018, vol. 32, no. 4, pp. 221–238.
3. Nogholi, M. and Alah, A., Optimization of Open Pit Mine Block Sequencing, Queensland University of Tech Nology, 2015.
4. Lambert, W.B., Brickey, A., Newman, A.M., and Eurek, K., Open-Pit Block-Sequencing Formulations: A Tutorial, Interfaces, 2014, vol. 44, no. 2, pp. 127–142.
5. Gholamnejad, J., Incorporation of Rehabilitation Cost into the Optimum Cut-Off Grade Determination, J. S. Afr. Inst. Min. Metall., 2009, vol. 109, no. 2, pp. 89–94.