Author:
Praštalo Ž.,Vujić S.,Kuzmanović M.,Stjepanović P.,Šarac R.
Reference15 articles.
1. Radosavljvić, M., Vujić, S., Boševski, T., Praštalo, Ž., and Jovanović, B., Single-Phase Local Optimization Model for Limestone Supply from Open Pit Mines to Heat Power Plants in Serbia, Journal of Mining Science., 2016, vol. 52, no. 4, pp. 704–711.
2. Study on the Possibility of Supplying Limestone for Flue Gas Desulfurization at the Kostolac CHP, Nikola Tesla CHP and New Thermal Facilities, Mining Institute and Tekon Belgrade, 2014.
3. Boševski, T., Vujić, S., Radosavljević, M., and Kuzmanović, M., Linear Model of Location Optimization of Limestone Exploitation and Consumption in Macedonia, Journal of Mining Science, 2019, vol. 55, no. 1, pp. 88–95.
4. Amankwah, H., Mathematical Optimization Models and Methods for Open-Pit Mining, Department of Mathematics Linköping University, Linköping, 2011.
5. Baloyi, V.D. and Meyer, L.D., The Development of a Mining Method Selection Model through a Detailed Assessment of Multi-Criteria Decision Methods, Elsevier, Results in Eng., 2020, vol. 8, 72 p.