1. Stanojević, R., Optimization Macroeconomic Models, Belgrade: Velarta, 2001.
2. Vujić, S., Miljanović, I., Kuzmanović, M., Bartulović, Z., Gajić, G., and Lazić, P., The Deterministic Fuzzy Linear Approach in Planning the Production of Mine System with Several Open Pits, Archives Min. Sci., 2011, vol. 56, no. 3, pp. 489–497.
3. Ali, M.A.M. and Yang, H.S., Transportation Problem: A Special Case for Linear Programing Problems in Mining Engineering, Int. J. Min. Sci. Technol., 2012, vol. 22, no. 3, pp. 371–377.
4. Radosavljvić, М., Vujić, S., Boševski, T., Praštalo, Ž., and Jovanović, B., Single-Phase Local Optimization Model for Limestone Supply from Open-Pit Mines to Heat Power Plants in Serbia, J. Min. Sci., 2016, vol. 52, no. 4, pp. 704–711.
5. Vujić, S., Benović, T., Miljanović, I., Hudej, M., Milutinović, A., and Pavlović, P., Fuzzy Linear Model of Production Optimization of Mining Systems with Multiple Entities, Int. J. Minerals, Metallurgy and Materials, 2011, vol. 18, no. 6, pp. 633–637.