1. Yu. A. Radin, A. S. Rubashkin, A. V. Davydov, and V. A. Rubashkin, “Mathematical simulation of the Kaliningrad DH power plant TETs-2 CCPP-450 unit startup regimes,” Therm. Eng. 52 (10), 800 (2005).
2. K. A. Molchanov, V. P. Strashnykh, D. A. Zhezherya, and O. A. Manevskaya, “The full-scale training simulator for educating the operative personnel of the CCPP-450 unit at OSC Mosenergo’s TETs-27 DH power plant,” Therm. Eng. 55 (10), 886 (2008).
3. Technical Requirements for Maneuverability of the Combined-Cycle Power-Generating Installations of SingleBoiler Single-Turbine Thermal Power Plants (ORGRES, Moscow, 1996) [in Russian].
4. E. R. Plotkin, Yu. A. Radin, V. V. Uyutov, V. G. Zaitsev, V. M. Kremenchugskii, and E. E. Goverdovskii, A Standard Instruction on Starting a 300 MW Two-Boiler Single-Turbine Unit Equipped with the K-300-240 LMZ Turbine according to the Single-Boiler Single-Turbine Power Unit Arrangement (SPO Soyuztekhenergo, 1980) [in Russian].
5. L. B. Lim and C. Dometakis, “Effects of cycling on the remaining life of HRSG’s,” Mod. Pow. Syst., July, 25–27 (2001).