1. STO (Standard) 59012820.27.100.004-2012. Standard for Participation of Combined Cycle Plants in Normalized Primary Control of Frequency and Automatic Secondary Control of Frequency and Active Power Flows (Sist. Oper. Edin. Energ. Sist., Moscow, 2012).
2. Yu. A. Radin, Study and Improvement of Maneuverability of Combined Cycle Plants, Doctoral Dissertation in Engineering (All-Russia Thermal Engineering Inst., Moscow, 2013).
3. S. V. Tsanev, V. D. Burov, and A. N. Remezov, Gas Turbine and Combined Cycle Facilities of Thermal Power Plants, 3rd ed. (Mosk. Energ. Inst., Moscow, 2009) [in Russian].
4. A. D. Trukhnii, “Investigating the operation of a heat-recovery combined-cycle (steam–gas) installation under partial loads: Part 1. The object and the method of investigation,” Therm. Eng. 46, 29–34 (1999).
5. N. I. Davydov, N. V. Zorchenko, A. V. Davydov, and Yu. A. Radin, “Model studies for determining whether combined-cycle plants can participate in control of frequency and power flows in unified energy systems of Russia,” Therm. Eng. 56, 815–821 (2009).